Search
Close this search box.
20 Air Street

20 Air Street was completed in 2023 and involved the refurbishment of the reception, 2nd, 4th and 5th floors.

Rather than just stripping the floor back to a shell and starting again the team made a concerted effort to retain existing services where possible through justification and validation with a view to reducing carbon as best as possible.
Our full case study is at the link below:
https://www.watkinspayne.co.uk/case-studies/20-air-street

More Updates