Corsham Street

Client

Net Internal Floor Area

The refurbishment project at 18-21 Corsham Street is now complete. The project involved a complete refurbishment of the building to separate it from the boiler system in the adjacent building, and provide a new
heating and cooling installation through the use of mini-VRF split systems accompanied by heat recovery units for fresh air ventilation.

The existing building previously utilised a single phase supply so an upgrade in the supply authority meter to a 3-phase supply was also required.

The office floors were completed to a Cat A+ standard with a view that tenants could potentially move straight in with the client electing to provide tea points and some other tenants services onto the floors.

HVAC Services: Refrigerant based heating and cooling with on floor heat recovery ventilation units and new LED lighting.

Watkins Payne Services Provided:

More CASE STUDIES
Refurbishment

Nash House, London

Nash House is located on the corner of Maddox Street and St George Street in London and was constructed in 1980s. The site is right in front of the Garde I listed Church of St George and stone throw away from famous Handover Square. Currently ground floor is occupied by a retail tenant where the lower ground, 1st floor to 5th floor is office accommodation.

Read More »
Vienna House
Sustainability

Vienna House

Vienna House is an impressive three storey refurbishment that provides 26,000ft² of office space across the development which provides best in class cycle commuter facilities.

Read More »
202 Hammersmith
Refurbishment

202 Hammersmith Road, London

The building at 202 Hammersmith Road has been refurbished to offer 14,864ft² of high quality office accommodation, for which Watkins Payne supplied building services engineering and energy consultancy to achieve an EPC B rating.

Read More »
St James's Place
Offices

St James’s Place

The building services use a 4-pipe fan coil unit arrangement with various ventilation systems to suit the different use areas. Full building power back-up standby generation, UPS, security and access control and automatic blinds all formed part of the fit-out.

Read More »