Building 5 – Foundation Business Park

Location

OFFICE Area

Building 5 has been shortlisted for the BCO regional awards!

Building 5, Foundation Business Park is the first offering of a site wide re-fresh at the business park in Maidenhead. The new office building feature 66,575ft² of net lettable area over three floors.

The office development with a central core and a triple height reception is comfort cooled utilising air source heat pumps. Fresh air is delivered via a central air handling unit with a high efficiency thermal wheel. Taking advantage of the flat roof structure a large array of photovoltaics has been installed.

With this all new high efficiency services been installed, and the office building achieved a ‘A’ rated EPC and ‘Very Good’ BREEAM rating along with WiredScore rating of ‘Gold’.

  • Client

    JP Morgan Asset Management

  • Project Manager

    CBRE

  • Architect

    Scott Brownrigg

  • Structural Engineer

    Hurst Peirce + Malcolm LLP

  • Cost Consultant

    Quantem Consulting LLP

Watkins Payne Services

More CASE STUDIES

One Hanover Street

All MEP systems within One Hanover Street are being fully replaced, with new services distributed through the upgraded risers to each office floor. The refurbished building will benefit from high-efficiency heat-recovery systems, LED lighting throughout, intelligent lighting controls, a common network system and new fan-coil units among other modern building services upgrades.

Read More »

16 New Burlington Place

This prestigious development is focused on delivering best-in-class workplace standards while achieving high levels of sustainability, occupant wellbeing and energy efficiency.

Read More »

9 Cavendish Square

Located in the heart of London’s West End, 9 Cavendish Square is undergoing a high-quality refurbishment to transform this prestigious address into a modern, efficient, and sustainable workplace. The works involve a full mechanical, electrical, and public health (MEPH) services upgrade to deliver a building that meets contemporary operational and environmental standards.

Read More »

76 Southbank

Sustainability is incredibly important for the Client and as such the building is BREEAM ‘Outstanding’, WELL ‘enabled’ Gold, alongside WiredScore Platinum. In addition, the Design for Performance approach is been adopted in order to minimise operational energy and hence carbon emissions.

Read More »

Palm Court

The building has been meticulously refurbished to incorporate a range of sustainable features, targeting BREEAM Excellent and EPC A ratings.

Read More »