MidCity Place

Client

Gross Internal Floor Area

Acting on behalf of Oxford Properties the practice has undertaken both decarbonisation and Cat A refurbishment within the circa 350,000ft2 office led building while maintaining full operation for existing tenants throughout.

The decarbonisation project has adopted the principles to reduce energy demand and remove fossil fuel fed plant. This includes the installation of new air source heat pumps and central main ventilation systems heat recovery, that has contributed significantly to the improved EPC for the building, plus improving long-term energy performance.

On some of the office floors Cat A refurbishment has created new modern space with upgraded interiors, roof terrace improvements and enhanced amenity provision. The interiors design solution adopted the principle of high-level raft ceilings with integrated lighting, along with an element of exposed services, to deliver a clean aesthetic.

Watkins Payne provided MEP services and EPC assessment expertise for these projects and is currently working on further improvements to the building’s reception space and amenities.

  • Project Manager (decarbonisation project)
    Third London Wall
  • Cost Consultant (decarbonisation project)
    Gardiner + Theobald

Watkins Payne Services Provided:

More CASE STUDIES
External building photo of 5 Broadgate London

5 Broadgate, London

5 Broadgate is a new 12 story building next to Liverpool Street station in London which offer 700,000ft² of high quality office accommodation. This is the new headquarters for the Union Bank of Switzerland housing office and trading floors. Watkins Payne supplied building services engineering, BREEAM duties and energy consultancy to achieve BREEAM ‘Excellent’ and an EPC A rating.

Read More »
9 Cavendish Square

9 Cavendish Square

Located in the heart of London’s West End, 9 Cavendish Square is undergoing a high-quality refurbishment to transform this prestigious address into a modern, efficient, and sustainable workplace. The works involve a full mechanical, electrical, and public health (MEPH) services upgrade to deliver a building that meets contemporary operational and environmental standards.

Read More »

The Northcliffe

The project involved the refurbishment and extension of the existing building to deliver over 260,000sq ft of office space, achieving BREEAM ‘Outstanding’.

Read More »
Get in touch with our team