Project Shelby, 2 Colmore Row
The successful refurbishment and fit-out of the lower ground and ground floors.



Michael Faraday House is home to the Institution of Engineering and Technology (IET). It has undergone a complete redevelopment that will make it technologically more innovative and more sustainable for the benefit of its employees.
The key focus for this project was innovative workspaces with accessibility, sustainability and employee wellbeing.
Sustainability services:
At Watkins Payne, we have certified over 160 BREEAM projects, around 40% of which achieved either ‘Excellent’ or ‘Outstanding’ overall ratings. This refurbishment earned the BREEAM ‘Excellent’ rating (Building Research Establishment Environmental Assessment Method).
MEP services:
The building comprises office accommodation, staff welfare spaces, and facilities on the ground, 1st and 2nd floors. The building has three cores, including the escape staircases, lifts, and toilet areas.
The external areas on the site include an open courtyard in the centre of the building and car parking spaces.
The building services central plant is located in the basement plantroom, ground floor electrical plantrooms and in the open and enclosed plant areas at roof level. The majority of the services installations in the building are from the original base build construction, are dated and are considered to be past their recognised serviceable life span.
The refurbishment work to the existing building involved the replacement and remodelling of the CAT A and B installations in the building to create new and modern office accommodation for the IET comprising of:
Open plan offices, Meeting rooms, Reception, Comms room, Quiet rooms and booths, Print hubs, Tea points and refreshment points, Collaboration space, Training room, Meeting suites, Boardroom, Executive offices, Post/print room, First aid room, IT build room, Café/social hub including servery areas, Breakout/lounge, Atrium, Kitchen and pantry areas, Shower and areas, Refurbished toilets and core areas, New Car park lighting and Car charging points.
HVAC strategy includes a number of central air handling units and heat recovery VRF systems utilised for space heating, comfort cooling and domestic hot water generation.
We are pleased to say this refurbishment of Michael Faraday House was carried out with the building remaining occupied and without a major decant away from the site, meaning zero waste and a low amount into landfills.
“We wanted to design a building with the future in mind – one that gives our employees an intuitive, modern and fully accessible space in which they can thrive as well as playing our part to reduce our impact on the environment by ensuring our new building is built and run in a sustainable way.”
The successful refurbishment and fit-out of the lower ground and ground floors.
Client
Gross Internal Floor Area
Acting on behalf of Oxford Properties the practice has undertaken both decarbonisation and Cat A refurbishment within the circa 350,000ft2 office led building while maintaining full operation for existing tenants throughout.
All MEP systems within One Hanover Street are being fully replaced, with new services distributed through the upgraded risers to each office floor. The refurbished building will benefit from high-efficiency heat-recovery systems, LED lighting throughout, intelligent lighting controls, a common network system and new fan-coil units among other modern building services upgrades.
This prestigious development is focused on delivering best-in-class workplace standards while achieving high levels of sustainability, occupant wellbeing and energy efficiency.
Located in the heart of London’s West End, 9 Cavendish Square is undergoing a high-quality refurbishment to transform this prestigious address into a modern, efficient, and sustainable workplace. The works involve a full mechanical, electrical, and public health (MEPH) services upgrade to deliver a building that meets contemporary operational and environmental standards.
Sustainability is incredibly important for the Client and as such the building is BREEAM ‘Outstanding’, WELL ‘enabled’ Gold, alongside WiredScore Platinum. In addition, the Design for Performance approach is been adopted in order to minimise operational energy and hence carbon emissions.