Navigation Park Phase 2, Enfield

Client

Gross Internal Floor Area

The first carbon neutral industrial buildings in London have been completed at the SEGRO Navigation Park Phase 2 in Enfield. Achieving carbon neutrality is also a first time achievement for SEGRO marking a continuing successful relationship.

The development consists of 173,130ft2 of Grade A warehouse and office space across three units which have all attained A+ rated EPCs and a BREEAM Excellent rating. Due to its excellent sustainability, the project was shortlisted in the commercial PV project category of the 2016 Clean Energy Awards.

The carbon neutral status was achieved by exemplary as-built air tightness, façade solar and thermal performance significantly in excess of the Building Regulations requirements, highly energy efficient M&E systems, LED lighting and photovoltaic panel arrays on the roof of the warehouse areas. The PV installation has a peak output of 535 kWp across the three buildings and is expected to offset approximately 240 tonnes of carbon per year.

The development comprises shell industrial space with the offices fitted out to a Category A standard. At an early stage the project achieved a pre-let with Camden Town Brewery taking Unit 1 as their new brewing headquarters. The overall development reached a successful completion in December 2016.

The project had its challenges, being adjacent to the River Lee Navigation, and being flexible to incorporate tenant variations to Unit 1 to meet Camden Town’s specific brewing needs.

As is usual with SEGRO developments, the scheme incorporated extensive landscaping to soften the overall appearance.

Watkins Payne Services Provided:

More CASE STUDIES
IDR - Independent Design Review

90 Long Acre

The project also involved the refurbishment of the reception space and improvement of the cycle store entrance and wayfinding at basement level.

Read More »
Sustainability

Project Genesis, Endeavour Dr

The completed site now comprises four detached industrial warehouse units ranging from 14,000sq ft to 36,000sq ft, all with naturally ventilated and heated offices. The two larger units each have an 8 person MRL passenger lift, while the smaller units have been provided with platform lifts. The warehouse area was designed as a shell for future fit-out with capped off utility services.

Read More »
Offices

The Leadenhall Building

BRIT Insurance took 5 floors of the Leadenhall building with views over Tower Bridge and the Thames. The 60,000ft² of high quality office accommodation was fitted out to Category B.

Read More »
1 Forbury
Refurbishment

1 Forbury Place Reading

Watkins Payne provided MEP systems and IT cabling design services for the fit-out of 186,000ft2 of commercial offices in the eight storey 1 Forbury Place in Reading, which formed the focus of SSE Services plc’s relocation strategy to consolidate several buildings from across southern England and accommodate 1,500 employees in a single location.

Read More »
IDR - Independent Design Review

135 Park Street

The development is an 12 storey building comprising 13,475m2 (NIA) of office area over basement to eleventh floor and 141m2 of retail area located on ground floor.

Read More »
Get in touch with our team