21 Sackville Street
The office building is targeting Energy Performance Certificate (EPC) rating of A.
Constructed some twenty years ago, the office building at 258 Bath Road, Slough comprises three storeys, split into east and west with a central core. SEGRO occupy the first floor east and the whole of the second floor, and Furniture Village occupy the ground floor west.
Watkins Payne have provided building services engineering to refurbish the ground floor east comprising 3,477ft² and the first floor west comprising 7,088ft².
As the existing mechanical and electrical services were in good condition, only a light touch was needed to extend the building’s M&E serviceable life for another ten years. The on-floor VAV system was overhauled and provides the offices with cooled or heated air controlled by the air handling units located at roof level. The new ceiling grid introduced into the office space has been provided with energy efficient LED luminaires.
AEW
Workman LLP
Morgan Lovell
NA
NA
The office building is targeting Energy Performance Certificate (EPC) rating of A.
Watkins Payne carried out the Independent Design Review role for Block A at The Soapworks development.
The development is an 12 storey building comprising 13,475m2 (NIA) of office area over basement to eleventh floor and 141m2 of retail area located on ground floor.
The project also involved the refurbishment of the reception space and improvement of the cycle store entrance and wayfinding at basement level.
The Minerva House redevelopment works will include the partial demolition of the existing building and extension comprising of additional upper floors and a new lower ground floor.
Watkins Payne carried out the Independent Design Review role for Seal House, a commercial office development, located in central London.