Following the successful refurbishment and fit-out of the lower ground and ground floors as a separate project, the team responsible for delivering Multistory at 2 Colmore Row commenced a phased refurbishment of the building’s extensive upper-floor office accommodation.

As tenant spaces became vacant, refurbishment works were undertaken across the 1st, 2nd, 3rd, 4th and 5th floors, together with the entirety of the 6th floor.

The MEP scope included the installation of a new VRF heating and cooling system, integrated with floor-by-floor ventilation systems using heat recovery units. The project also delivered new energy-efficient LED lighting with intelligent lighting controls, alongside a fully upgraded fire alarm system. Exposed services were adopted to align with the architectural requirements which meant a heightened level of coordination and attention to detail throughout the MEP installation. This collaborative approach has resulted in a striking aesthetic with the building services forming an integral part of the overall design.
In addition to delivering the MEP services, Watkins Payne were appointed as the project’s BREEAM Assessor. The refurbishment is on track to achieve BREEAM ‘Excellent’ reflecting the projects strong sustainability credentials.

The completion of this phase marks the culmination of several years of involvement with the building, however there remains the potential for future Cat B fit-out works on some of the lower floors, combining elements of the previous projects to accommodate an incoming tenant.

  • Architect
    Hawkins Brown
  • Project Manager
    Ridge and Partners
  • Cost Consultant
    Corefive

Watkins Payne Services Provided:

More CASE STUDIES

Globeside, Building 2

Princes Arcade in St James’s is part of the Grade II listed building within which a major new restaurant unit has been created along with office, core and atrium refurbishment.

Read More »

The Sanctuary

The Practice was responsible for the design and site monitoring of the related mechanical, electrical and public health services installation.

Read More »

1 Blyth Gate, Birmingham

1 Blyth Gate, Birmingham is a three-story office development in Solihull. It boasts a triple height reception and the amenity spaces within the business park in which the development sits offer excellent views of the surrounding area. The building has been provided with additional showers and cycling facilities to assist in promoting sustainable travel methods to work and drive down carbon emissions.

Read More »
Get in touch with our team