Search
Close this search box.

Building 600, Bristol

Building 600, Bristol

Project
Building 600, Bristol
Client
Columbia Threadneedle
Project Manager
Workman LLP
Architect
n/a
Development Area
12,500 sq.ft
Services provided by Watkins Payne
MEP services engineering, Vertical Transportation engineering, Energy consultant

Building 600 located at Aztec West Business park in Bristol has been refurbished to offer 12,500ft² of high quality office accommodation, for which Watkins Payne supplied building services engineering, vertical transportation engineering, BREEAM duties and energy consultancy to achieve an BREEAM ‘Excellent’ and EPC B rating.

All new building services were installed, using a heat recovery ventilation system to provide fresh air, and air source heat pumps (ASHP) for heating and cooling the office space.

The swirl square tiled within the suspended ceiling conceal the fan coil units which provides heating and cooling as well as fresh air ductwork from ventilation units at roof level. The flat panel LED light fittings and controls are installed which considered occupant comfort and also reduce buildings energy consumption.

A metal spiral staircase connects the floors and is a prominent feature within the atrium reception.