21 Sackville Street

Client

Gross Internal Floor Area

21 Sackville Street is located within the Mayfair conservation area and stands proudly alongside many Grade I to Grade III listed buildings. This five-story building accommodates office and residential space including end of trip cycling facilities at basement level.

We are part of the team completing a full refurbishment of all office floors to CAT B with the design incorporating open plan office, meeting rooms, collaboration areas and breakout spaces. All new services including air source heat pumps to provide heating and cooling to ceiling mounted 4-pipe fan coil units, LED lighting with integral presence detection and air handling unit with heat recovery have been included. Photovoltaic panels have been installed over the lift motor room which feeds back into the building to reduce energy cost. Basement level houses the new commuter facility with cycling spaces, male and female shower and drying space.

The office building has achieved an Energy Performance Certificate (EPC) rating of A. The project has also been subject to an embodied carbon assessment using OneClick and the upfront embodied carbon (A1-A5) meets The Crown Estate’s latest DSP targets. The operational carbon has also been assessed for the development using TM54 to give a full picture of the carbon impact from the scheme. Project completed in August 2024.

Watkins Payne Services Provided:

More CASE STUDIES
Retail

Multistory

Multistory (formerly 2 Colmore Square and Cannon House) is setting the new benchwork for Sustainability, targeting WiredScore Platinum, Fitwel 2 star and Energy Performance Certificate (EPC) of ‘B’.

Read More »
Premier Inn
Residential

Premier Inn, Uxbridge

Premier Inn has recently invested in the redevelopment of its Uxbridge hotel to provide increased accommodation options and better facilities for guests.

Read More »
Retail

234 Bath Road, Slough

234 Bath Road development located in Slough is arranged over ground, first and second floors, with a basement level car park and podium level car park to the rear. The development constructed in 2016 stand at 68,000 ft2 of office accommodation. Part of the ground office floor area was utilised to provide a café to enhance the amenities within the development.

Read More »