Search
Close this search box.
Multistory

Client

Gross Internal Floor Area

Multistory is the bringing together of two separate buildings (formerly 2 Colmore Square and Cannon House) to create one exceptional workspace featuring Birmingham’s largest amenity space that ties together communal areas for inhabitation on a work and social basis.

The key improvements that have been made as part of this project include, 2 new receptions for a best-in-class arrival experience, the introduction of a 100-person Auditorium, new lifts with destination control, a bar/coffee lounge, an outdoor terrace, communal bookable meeting rooms, generous co-working areas, new car EV charging points, best in class cycle storage and outstanding showers and changing facilities. Multistory is setting the new benchwork for Sustainability, targeting WiredScore Platinum, Fitwel 2 star and Energy Performance Certificate (EPC) of ‘B’.

Air soured heat pumps provide the heating and cooling to the amenity areas with heat recovery air handling unit providing fresh air. White box retail units are provided at ground floor level with larger retail units within the lower ground level. The two levels are linked with a grand staircase.

Watkins Payne Services Provided:

More CASE STUDIES

32 Duke Street, London

32 Duke Street in the heart of St James’s, the contemporary development known as The Marq comprises mixed use accommodation, with A1 and A3 retail units across ground and basement floors and 35,460ft2 of office space on six upper levels.

Read More »

202 Hammersmith Road, London

The building at 202 Hammersmith Road has been refurbished to offer 14,864ft² of high quality office accommodation, for which Watkins Payne supplied building services engineering and energy consultancy to achieve an EPC B rating.

Read More »

10 Brock Street, Regents Place

The mixed use development comprises two office buildings totalling 530,000ft² of high quality office accommodation together with a 162 unit residential scheme consisting of a 26 storey private apartment tower and affordable housing building. The scheme also includes retail units and a community arts facility. 10 Brock Street is the larger of the office buildings and Watkins Payne supplied building services engineering, vertical transportation engineering, BREEAM duties and energy consultancy to achieve BREEAM ‘Excellent’ and an EPC B rating.

Read More »

Arca, Birmingham

Exposed services has been adopted for the office floor provided new LED linear lighting, ducted fan coil units and power distributed within the office floors.

Read More »

The Northcliffe

The project involved the refurbishment and extension of the existing building to deliver over 260,000sq ft of office space, achieving BREEAM ‘Outstanding’.

Read More »
Get in touch with our team