St James’s Market Phase 2

Client

St Jame’s Market Phase 2 will comprise an approximate 300,000ft² mixed use development. At the basement and ground floor will be retail and restaurant units together with two office receptions. Levels 1 to 7 will comprise new office accommodation served by two separate cores in order to provide flexibility for future leasing options. There will be two levels of basement housing plant, waste facility, cycle stores, changing room and shower facilities together with the usual building management space. Further plant areas are provided at roof level including for retail and office tenant’s use. At various levels of the building will be external terraces with a combination of private and communal use. 

Sustainability is very high on both Client’s agenda including the team targeting BREEAM ‘Outstanding’ rating for the office accommodation and ‘Excellent’ rating for the retail space, along with a WELL Gold rating. The Crown Estate Development Sustainability Principles are being adopted throughout together with maximising amenity, biodiversity and renewable energy solutions. 

The MEP services strategy for heating and cooling in all areas aligns with The London Plan in terms of utilising air source heat pumps with no burning of fossil fuel. In addition, the project is the “pioneer” related to the Design for Performance initiative and NABERS UK rating.

Watkins Payne Services Provided:

More CASE STUDIES

Quay Place

Quay Place in Birmingham is situated next to the Utilita Arena which is a sport, exhibition and a concert venue. The works consisted of a new structure to contain the main reception, meeting room, changing facilities and a café for the site.

Read More »
The Smithson Building, Farringdon

The Smithson Building, Farringdon

The 47,900ft² area of The Smithson building in Farringdon was refurbished to high quality office accommodation, for which Watkins Payne supplied building services engineering, vertical transportation engineering and energy consultancy to achieve an EPC B rating. The refurbished area is spread across basement and ground floor.

Read More »

Minerva House

The Minerva House redevelopment works will include the partial demolition of the existing building and extension comprising of additional upper floors and a new lower ground floor.

Read More »
External building of 11 Waterloo Place in London

11 Waterloo Place

11 Waterloo Place is located in St James’s London. The newly refurbished CAT A office space on the 1st floor is complete with amazing views of Big Ben and St James’s Park.

Read More »