St James’s Market Phase 2

Client

St Jame’s Market Phase 2 will comprise an approximate 300,000ft² mixed use development. At the basement and ground floor will be retail and restaurant units together with two office receptions. Levels 1 to 7 will comprise new office accommodation served by two separate cores in order to provide flexibility for future leasing options. There will be two levels of basement housing plant, waste facility, cycle stores, changing room and shower facilities together with the usual building management space. Further plant areas are provided at roof level including for retail and office tenant’s use. At various levels of the building will be external terraces with a combination of private and communal use. 

Sustainability is very high on both Client’s agenda including the team targeting BREEAM ‘Outstanding’ rating for the office accommodation and ‘Excellent’ rating for the retail space, along with a WELL Gold rating. The Crown Estate Development Sustainability Principles are being adopted throughout together with maximising amenity, biodiversity and renewable energy solutions. 

The MEP services strategy for heating and cooling in all areas aligns with The London Plan in terms of utilising air source heat pumps with no burning of fossil fuel. In addition, the project is the “pioneer” related to the Design for Performance initiative and NABERS UK rating.

Watkins Payne Services Provided:

More CASE STUDIES

Fortess Grove

The exposed services strategy implemented at Fortess Grove compliments the industrial nature of the building. Cycling facilities are provided along with showers and lockers at ground floor level accessed directly from the rear of the building along Railey Mews. The development achieved a WiredScore certification of ‘Gold’ and a B rated Energy Performance Certification.

Read More »
The Smithson Building, Farringdon

The Smithson Building, Farringdon

The 47,900ft² area of The Smithson building in Farringdon was refurbished to high quality office accommodation, for which Watkins Payne supplied building services engineering, vertical transportation engineering and energy consultancy to achieve an EPC B rating. The refurbished area is spread across basement and ground floor.

Read More »

Central Park, Brighton

The property situated on the A23 near Brighton was granted permission by the council under permitted development rights to change to a residential site from office development to provide 63 apartments. The apartments are separate over seven stories consisting of one, two and three bed apartments. The redeveloped to offer 59,000ft² of high quality residential accommodation, for which Watkins Payne supplied building services engineering and energy consultancy to achieve an EPCs between B – C rating.

Read More »
Vienna House

Vienna House

Vienna House is an impressive three storey refurbishment that provides 26,000ft² of office space across the development which provides best in class cycle commuter facilities.

Read More »

Multistory

Multistory (formerly 2 Colmore Square and Cannon House) is setting the new benchwork for Sustainability, targeting WiredScore Platinum, Fitwel 2 star and Energy Performance Certificate (EPC) of ‘B’.

Read More »

57 Broadwick Street, London

Located to the east of Carnaby Street and part of the Shaftesbury portfolio, 57 Broadwick Street has undergone an extensive refurbishment of the office and retail podium area to provide new shell restaurant and retail units, two new apartments on the fourth floor, and 20,445sq.ft office accommodation on first, second, third and part fourth floors.

Read More »
Get in touch with our team