20 Air Street

Client

Gross Internal Floor Area

20 Air Street sits in the heart of London’s West End and was completed in 2011. The 2nd, 4th and 5th floor leases had expired and The Crown Estate commissioned the design team of Watkins Payne, Cogent and Orms to complete a refurbishment and reinstatement of these floors to return them to Cat A for re-letting. The project also involved the refurbishment of the reception space and improvement of the cycle store entrance and wayfinding at basement level.

The brief was clear in that replacement of equipment was only to take place if necessary and so all fan coil units, primary ductwork and pipework across the floors was re-used wherever possible and recommissioned to meet the original Cat A layouts.

The MEP services were subject to a validation exercise which showed that the control valves serving the fan coil units needed replacing and so these were replaced across all of the floors and in the reception. In addition the lighting in the Cat A spaces was replaced with new. In order to minimise wastage the 2nd and 5th floors had only a portion of the floor completed with a ceiling layout to show how a tenant could fit out the space. The rest of the floor was left without a ceiling and temporary lighting to allow the space to be let but all equipment in these areas was recommissioned.

The building is subject to BREEAM RFO 2014 and is on track to achieve a ‘Very Good’ rating.

Watkins Payne Services Provided:

More CASE STUDIES
IDR - Independent Design Review

Seal House

Watkins Payne carried out the Independent Design Review role for Seal House, a commercial office development, located in central London.

Read More »
IDR - Independent Design Review

135 Park Street

The development is an 12 storey building comprising 13,475m2 (NIA) of office area over basement to eleventh floor and 141m2 of retail area located on ground floor.

Read More »
Sustainability

76 Southbank

Sustainability is incredibly important for the Client and as such the building is targeting BREEAM ‘Outstanding’, WELL ‘enabled’ Gold, alongside WiredScore Platinum. In addition, the Design for Performance approach is being adopted in order to minimise operational energy and hence carbon emissions.