Search
Close this search box.
Building 5 – Foundation Business Park

Location

OFFICE Area

Building 5 has been shortlisted for the BCO regional awards!

Building 5, Foundation Business Park is the first offering of a site wide re-fresh at the business park in Maidenhead. The new office building feature 66,575ft² of net lettable area over three floors.

The office development with a central core and a triple height reception is comfort cooled utilising air source heat pumps. Fresh air is delivered via a central air handling unit with a high efficiency thermal wheel. Taking advantage of the flat roof structure a large array of photovoltaics has been installed.

With this all new high efficiency services been installed, and the office building achieved a ‘A’ rated EPC and ‘Very Good’ BREEAM rating along with WiredScore rating of ‘Gold’.

  • Client

    JP Morgan Asset Management

  • Project Manager

    CBRE

  • Architect

    Scott Brownrigg

  • Structural Engineer

    Hurst Peirce + Malcolm LLP

  • Cost Consultant

    Quantem Consulting LLP

Watkins Payne Services

More CASE STUDIES

Pembroke House

Watkins Payne is proud to have been an integral part of the MEPH services, Vertical Transportation and sustainability BREEAM consultancy for the CAT A fit-out project at Pembroke Building, overseen by Cogent BC LLP.

Read More »

Adventure Park Windsor

The Adventure Park covers 1.2 acres and is created using sustainably-sourced wood from the Windsor Estate, providing an extensive playground for families to explore together.

Read More »

53 Great Suffolk Street

The refurbishment of 53 Great Suffolk Street in London involved the transformation of a historic warehouse into a contemporary office space. This project focused on preserving the building’s industrial character while introducing modern amenities and sustainable features.

Read More »

The Kodak

The Kodak building in Holborn has been designed to achieve high sustainability benchmarks with WELL ‘Gold’ and BREEAM ‘Excellent’.

Read More »

20 Air Street

The project also involved the refurbishment of the reception space and improvement of the cycle store entrance and wayfinding at basement level.

Read More »
Get in touch with our team