Navigation Park Phase 2, Enfield

Gross Internal Floor Area

The first carbon neutral industrial buildings in London have been completed at the SEGRO Navigation Park Phase 2 in Enfield. Achieving carbon neutrality is also a first time achievement for SEGRO marking a continuing successful relationship.

The development consists of 173,130ft2 of Grade A warehouse and office space across three units which have all attained A+ rated EPCs and a BREEAM Excellent rating. Due to its excellent sustainability, the project was shortlisted in the commercial PV project category of the 2016 Clean Energy Awards.

The carbon neutral status was achieved by exemplary as-built air tightness, façade solar and thermal performance significantly in excess of the Building Regulations requirements, highly energy efficient M&E systems, LED lighting and photovoltaic panel arrays on the roof of the warehouse areas. The PV installation has a peak output of 535 kWp across the three buildings and is expected to offset approximately 240 tonnes of carbon per year.

The development comprises shell industrial space with the offices fitted out to a Category A standard. At an early stage the project achieved a pre-let with Camden Town Brewery taking Unit 1 as their new brewing headquarters. The overall development reached a successful completion in December 2016.

The project had its challenges, being adjacent to the River Lee Navigation, and being flexible to incorporate tenant variations to Unit 1 to meet Camden Town’s specific brewing needs.

As is usual with SEGRO developments, the scheme incorporated extensive landscaping to soften the overall appearance.

Watkins Payne Services Provided:

More CASE STUDIES
Refurbishment

1 Forbury Place Reading

Watkins Payne provided MEP systems and IT cabling design services for the fit-out of 186,000ft2 of commercial offices in the eight storey 1 Forbury Place in Reading, which formed the focus of SSE Services plc’s relocation strategy to consolidate several buildings from across southern England and accommodate 1,500 employees in a single location.

Read More »
Retail

Princes Arcade

Princes Arcade in St James’s is part of the Grade II listed building within which a major new restaurant unit has been created along with office, core and atrium refurbishment.

Read More »
Refurbishment

Vantage Point

Watkins Payne reviewed a number of mechanical and electrical options with the team, focusing on retention of key central plant, overhaul and replacement of plant where required, and LED lighting to reduce energy and improve the office environment.

Read More »
16 Burlington Place
Refurbishment

16 New Burlington Place

This prestigious development is focused on delivering best-in-class workplace standards while achieving high levels of sustainability, occupant wellbeing and energy efficiency.

Read More »
Claridge's Hotel
Refurbishment

The Claridge’s Hotel

The Practice was responsible for designing the complete refurbishment of the mechanical, electrical and public health services to all of the guest rooms, together with the penthouse units in The Claridge’s Hotel.