This prestigious development is focused on delivering best-in-class workplace standards while achieving high levels of sustainability, occupant wellbeing and energy efficiency.
The first carbon neutral industrial buildings in London have been completed at the SEGRO Navigation Park Phase 2 in Enfield. Achieving carbon neutrality is also a first time achievement for SEGRO marking a continuing successful relationship.
The development consists of 173,130ft2 of Grade A warehouse and office space across three units which have all attained A+ rated EPCs and a BREEAM Excellent rating. Due to its excellent sustainability, the project was shortlisted in the commercial PV project category of the 2016 Clean Energy Awards.
The carbon neutral status was achieved by exemplary as-built air tightness, façade solar and thermal performance significantly in excess of the Building Regulations requirements, highly energy efficient M&E systems, LED lighting and photovoltaic panel arrays on the roof of the warehouse areas. The PV installation has a peak output of 535 kWp across the three buildings and is expected to offset approximately 240 tonnes of carbon per year.
The development comprises shell industrial space with the offices fitted out to a Category A standard. At an early stage the project achieved a pre-let with Camden Town Brewery taking Unit 1 as their new brewing headquarters. The overall development reached a successful completion in December 2016.
The project had its challenges, being adjacent to the River Lee Navigation, and being flexible to incorporate tenant variations to Unit 1 to meet Camden Town’s specific brewing needs.
As is usual with SEGRO developments, the scheme incorporated extensive landscaping to soften the overall appearance.

This prestigious development is focused on delivering best-in-class workplace standards while achieving high levels of sustainability, occupant wellbeing and energy efficiency.

Quay Place in Birmingham is situated next to the Utilita Arena which is a sport, exhibition and a concert venue. The works consisted of a new structure to contain the main reception, meeting room, changing facilities and a café for the site.

Client
Gross Internal Floor Area
Acting on behalf of Oxford Properties the practice has undertaken both decarbonisation and Cat A refurbishment within the circa 350,000ft2 office led building while maintaining full operation for existing tenants throughout.

Unit 3 at Dorking Business Park has just received Practical Completion following a comprehensive refurbishment.

Located in the heart of Slough, the office building at 25 Windsor Road has been transformed.

We are looking forward to our continued involvement in the project, pending positive planning feedback.