Navigation Park Phase 2, Enfield

Gross Internal Floor Area

The first carbon neutral industrial buildings in London have been completed at the SEGRO Navigation Park Phase 2 in Enfield. Achieving carbon neutrality is also a first time achievement for SEGRO marking a continuing successful relationship.

The development consists of 173,130ft2 of Grade A warehouse and office space across three units which have all attained A+ rated EPCs and a BREEAM Excellent rating. Due to its excellent sustainability, the project was shortlisted in the commercial PV project category of the 2016 Clean Energy Awards.

The carbon neutral status was achieved by exemplary as-built air tightness, façade solar and thermal performance significantly in excess of the Building Regulations requirements, highly energy efficient M&E systems, LED lighting and photovoltaic panel arrays on the roof of the warehouse areas. The PV installation has a peak output of 535 kWp across the three buildings and is expected to offset approximately 240 tonnes of carbon per year.

The development comprises shell industrial space with the offices fitted out to a Category A standard. At an early stage the project achieved a pre-let with Camden Town Brewery taking Unit 1 as their new brewing headquarters. The overall development reached a successful completion in December 2016.

The project had its challenges, being adjacent to the River Lee Navigation, and being flexible to incorporate tenant variations to Unit 1 to meet Camden Town’s specific brewing needs.

As is usual with SEGRO developments, the scheme incorporated extensive landscaping to soften the overall appearance.

Watkins Payne Services Provided:

More CASE STUDIES
Sustainability

One Hanover Street

All MEP systems within One Hanover Street are being fully replaced, with new services distributed through the upgraded risers to each office floor. The refurbished building will benefit from high-efficiency heat-recovery systems, LED lighting throughout, intelligent lighting controls, a common network system and new fan-coil units among other modern building services upgrades.

Read More »
St James's Place
Offices

St James’s Place

The building services use a 4-pipe fan coil unit arrangement with various ventilation systems to suit the different use areas. Full building power back-up standby generation, UPS, security and access control and automatic blinds all formed part of the fit-out.

Read More »
External building photo of 5 Broadgate London
Sustainability

5 Broadgate, London

5 Broadgate is a new 12 story building next to Liverpool Street station in London which offer 700,000ft² of high quality office accommodation. This is the new headquarters for the Union Bank of Switzerland housing office and trading floors. Watkins Payne supplied building services engineering, BREEAM duties and energy consultancy to achieve BREEAM ‘Excellent’ and an EPC A rating.

Read More »
Refurbishment

The Sanctuary

The Practice was responsible for the design and site monitoring of the related mechanical, electrical and public health services installation.

Read More »