Navigation Park Phase 2, Enfield

Gross Internal Floor Area

The first carbon neutral industrial buildings in London have been completed at the SEGRO Navigation Park Phase 2 in Enfield. Achieving carbon neutrality is also a first time achievement for SEGRO marking a continuing successful relationship.

The development consists of 173,130ft2 of Grade A warehouse and office space across three units which have all attained A+ rated EPCs and a BREEAM Excellent rating. Due to its excellent sustainability, the project was shortlisted in the commercial PV project category of the 2016 Clean Energy Awards.

The carbon neutral status was achieved by exemplary as-built air tightness, façade solar and thermal performance significantly in excess of the Building Regulations requirements, highly energy efficient M&E systems, LED lighting and photovoltaic panel arrays on the roof of the warehouse areas. The PV installation has a peak output of 535 kWp across the three buildings and is expected to offset approximately 240 tonnes of carbon per year.

The development comprises shell industrial space with the offices fitted out to a Category A standard. At an early stage the project achieved a pre-let with Camden Town Brewery taking Unit 1 as their new brewing headquarters. The overall development reached a successful completion in December 2016.

The project had its challenges, being adjacent to the River Lee Navigation, and being flexible to incorporate tenant variations to Unit 1 to meet Camden Town’s specific brewing needs.

As is usual with SEGRO developments, the scheme incorporated extensive landscaping to soften the overall appearance.

Watkins Payne Services Provided:

More CASE STUDIES
Retail

Coda Studio-Gym, Fulham

Coda Studio, located in Fulham’s Munster Road, contains 57 self-contained office units providing rentable accommodation for various types of small businesses. An 8,600ft² section of the existing car park was reallocated for the development of a gym, lounge and meeting area, for which Watkins Payne supplied building services engineering.

Read More »
Sustainability

Portland House

The development at Portland House will comprise circa 300,000ft² of primary office led accommodation together with retail and amenity space.

Read More »
Refurbishment

106-110 Kentish Town Road

The refurbishment provides office space, along with the ground floor being granted A1 retail use. High-level exposed services were designed to give an industrial warehouse feel. The offices are heated and cooled by independent variable refrigerant flow (VRF) air source heat pump systems and illuminated by suspended linear LED fittings.

Read More »
Sustainability

Colmore Gate

We are looking forward to our continued involvement in the project, pending positive planning feedback.

Read More »
86 Fetter Lane
Sustainability

Fetter Yard, London

Watkins Payne was involved with the Fetter Yard project on 86 Fetter Lane for 5 years and provided the MEP services design and BREEAM assessment.

Read More »
Refurbishment

7 Bermondsey Street, London

The 7,600ft² area of 7 Bermondsey Street near London Bridge Station was refurbished to high quality office accommodation, for which Watkins Payne supplied building services engineering and vertical transportation engineering. The refurbished area is spread across basement and ground floor.

Read More »