Navigation Park Phase 2, Enfield

Gross Internal Floor Area

The first carbon neutral industrial buildings in London have been completed at the SEGRO Navigation Park Phase 2 in Enfield. Achieving carbon neutrality is also a first time achievement for SEGRO marking a continuing successful relationship.

The development consists of 173,130ft2 of Grade A warehouse and office space across three units which have all attained A+ rated EPCs and a BREEAM Excellent rating. Due to its excellent sustainability, the project was shortlisted in the commercial PV project category of the 2016 Clean Energy Awards.

The carbon neutral status was achieved by exemplary as-built air tightness, façade solar and thermal performance significantly in excess of the Building Regulations requirements, highly energy efficient M&E systems, LED lighting and photovoltaic panel arrays on the roof of the warehouse areas. The PV installation has a peak output of 535 kWp across the three buildings and is expected to offset approximately 240 tonnes of carbon per year.

The development comprises shell industrial space with the offices fitted out to a Category A standard. At an early stage the project achieved a pre-let with Camden Town Brewery taking Unit 1 as their new brewing headquarters. The overall development reached a successful completion in December 2016.

The project had its challenges, being adjacent to the River Lee Navigation, and being flexible to incorporate tenant variations to Unit 1 to meet Camden Town’s specific brewing needs.

As is usual with SEGRO developments, the scheme incorporated extensive landscaping to soften the overall appearance.

Watkins Payne Services Provided:

More CASE STUDIES
50 Marshall Street
Sustainability

50 Marshall Street

Watkins Payne was commissioned to design a Cat A fit-out refurbishment across the existing 11,800sq.ft building. The ground floor was completely redeveloped with a new office entrance lobby and 1,300sq.ft new retail space.

Read More »
Refurbishment

106-110 Kentish Town Road

The refurbishment provides office space, along with the ground floor being granted A1 retail use. High-level exposed services were designed to give an industrial warehouse feel. The offices are heated and cooled by independent variable refrigerant flow (VRF) air source heat pump systems and illuminated by suspended linear LED fittings.

Read More »
Sustainability

101 New Cavendish Street

A wealth of experience in exposed services projects has enabled Watkins Payne to provide the highest level specification for the refurbishment of over 50,000ft² of office space at 101 New Cavendish Street in London.

Read More »
Refurbishment

Egale 2, Watford

Situated just a stone’s throw away from Watford Junction station, the Egale 2 building has been tastefully renovated into a multi-tenanted office environment, with a floor by floor split for tenancies providing a total of 11,000sqft of office space over four floors.

Read More »
Adventure Park Windsor
New Build

Adventure Park Windsor

The Adventure Park covers 1.2 acres and is created using sustainably-sourced wood from the Windsor Estate, providing an extensive playground for families to explore together.

Read More »