8 South Crescent, Canning Town

Client

Gross Internal Floor Area

8 South Crescent, Canning Town is now completed. It is a transformation of the industrial unit with a new and improved facade giving the building a dynamic and unique look.

This detached Industrial logistics unit is being fully refurbished with new ventilation and VRF comfort cooling and space heating systems for the office and reception areas, complete with new LED lighting installations.

The roof has been fitted with solar PV panels. The solar PV panels will provide enough renewable electricity to offset the annual operation of all internal lighting. 

The unit is located in South Crescent off Cody Road within Canning Town, approximately 3 miles east of The City, in the London Borough of Newham. The area enjoys easy access to the A13 which in turn provides a swift route to Docklands, The City, A12/A102 (Blackwall Tunnel Northern Approach) to the west and the North Circular Road (A406) and M25 to the east.

Watkins Payne Services Provided:

More CASE STUDIES
IDR - Independent Design Review

Red Lion Court

Watkins Payne carried out the Independent Design Review role for Red Lion Court, a mixed use commercial office development, located in central London.

Read More »
IDR - Independent Design Review

135 Park Street

The development is an 12 storey building comprising 13,475m2 (NIA) of office area over basement to eleventh floor and 141m2 of retail area located on ground floor.

Read More »
Sustainability

One Hanover Street

All MEP systems within One Hanover Street are being fully replaced, with new services distributed through the upgraded risers to each office floor. The refurbished building will benefit from high-efficiency heat-recovery systems, LED lighting throughout, intelligent lighting controls, a common network system and new fan-coil units among other modern building services upgrades.

Read More »
Offices

The Leadenhall Building

BRIT Insurance took 5 floors of the Leadenhall building with views over Tower Bridge and the Thames. The 60,000ft² of high quality office accommodation was fitted out to Category B.

Read More »