8 South Crescent, Canning Town

Client

Gross Internal Floor Area

8 South Crescent, Canning Town is now completed. It is a transformation of the industrial unit with a new and improved facade giving the building a dynamic and unique look.

This detached Industrial logistics unit is being fully refurbished with new ventilation and VRF comfort cooling and space heating systems for the office and reception areas, complete with new LED lighting installations.

The roof has been fitted with solar PV panels. The solar PV panels will provide enough renewable electricity to offset the annual operation of all internal lighting. 

The unit is located in South Crescent off Cody Road within Canning Town, approximately 3 miles east of The City, in the London Borough of Newham. The area enjoys easy access to the A13 which in turn provides a swift route to Docklands, The City, A12/A102 (Blackwall Tunnel Northern Approach) to the west and the North Circular Road (A406) and M25 to the east.

Watkins Payne Services Provided:

More CASE STUDIES
IDR - Independent Design Review

Seal House

Watkins Payne carried out the Independent Design Review role for Seal House, a commercial office development, located in central London.

Read More »
Refurbishment

Saffron House

Saffron House was refurbished to provide 38,000ft² of high quality office accommodation. Watkins Payne supplied building services engineering which saw the 1st, 2nd and the 3rd floor including the ground floor reception of Saffron House converted into open plan office areas and reception.

Read More »
Refurbishment

Globeside, Building 2

Princes Arcade in St James’s is part of the Grade II listed building within which a major new restaurant unit has been created along with office, core and atrium refurbishment.

Read More »
Sustainability

57 Broadwick Street, London

Located to the east of Carnaby Street and part of the Shaftesbury portfolio, 57 Broadwick Street has undergone an extensive refurbishment of the office and retail podium area to provide new shell restaurant and retail units, two new apartments on the fourth floor, and 20,445sq.ft office accommodation on first, second, third and part fourth floors.

Read More »