The Sanctuary

Client

The project involved the creation of new treatment rooms and reception areas within the existing health suite accommodation. The Practice was responsible for the design and site monitoring of the related mechanical, electrical and public health services installations. The works had to be carried out whilst the health and spa facilities were maintained in operation, representing significant technical challenges. 

Watkins Payne Services Provided:

More CASE STUDIES
Retail

Fitzroy Place

The mixed use development comprises two office buildings totalling 220,000ft² of high quality office accommodation together with a 289 unit residential scheme consisting of private apartments and affordable housing building.

Read More »
Sustainability

63-81 Pelham Street

‘The Royal Borough of Kensington and Chelsea has granted planning consent for 115,000 sq ft of new high-quality office space at 63-81 Pelham Street.’

Read More »
Refurbishment

Unit 8 Chichester Business Park

Unit 8, in Tangmere Business Park near Chichester, has been provided with a complete refurbishment giving both the warehouse and associated office space attached a much needed re-fresh and new feel.

Read More »
202 Hammersmith
Refurbishment

202 Hammersmith Road, London

The building at 202 Hammersmith Road has been refurbished to offer 14,864ft² of high quality office accommodation, for which Watkins Payne supplied building services engineering and energy consultancy to achieve an EPC B rating.

Read More »
Retail

Princes Arcade

Princes Arcade in St James’s is part of the Grade II listed building within which a major new restaurant unit has been created along with office, core and atrium refurbishment.

Read More »
Sustainability

103 Colmore Row

103 Colmore Row in Birmingham, has achieved a successful practical completion with BREEAM accreditation of ‘Excellent’, an EPC Rating A, and WiredScore rating of ‘Platinum’.

Read More »