Colmore Gate is a landmark development in the heart of Birmingham. The existing building consists of 16 floors with two basement floors over a podium and tower section constructed in the mid-1990s.
We have been working with the design team to extend and refurbish the building to provide 23 floors of office accommodation in the tower and 9 floors in the podium section, totalling approx. 315,000ft2 NIA. As part of the refurbishment, the existing VAV air handling system will be removed and replaced with an air source heat pump system with on-floor heat recovery units to provide comfort cooling, heating, and ventilation. Additionally the building will benefit from a building and energy management systems, high-efficiency LED lighting and controls.
The project ethos revolves around a core carbon principle of retaining existing structure and foundations and working within that constraint to provide new and exciting office space.
As the Sustainability Consultant on the project we are targeting BREEAM Outstanding, WELL Core Platinum, ActiveScore Platinum and RESET certified to maximise the scheme’s sustainability credentials. We are also completing a whole life carbon and circular economy assessment to see that we are maximising re-use and aiming to identify further reductions in carbon where possible.
In addition the building is subject to the Design for Performance approach with the aim to achieve a 5 Star NABERS UK rating. The building is projected to deliver an ‘A’ EPC rating.
The building’s planning application was submitted to Birmingham City Council in August 2023, and we provided all the necessary supporting documentation, including the sustainability statement and energy strategy.
We are looking forward to our continued involvement in the project, pending positive planning feedback.
This prestigious development is focused on delivering best-in-class workplace standards while achieving high levels of sustainability, occupant wellbeing and energy efficiency.
Building 600 located at Aztec West Business park in Bristol has been refurbished to offer 12,500ft² of high quality office accommodation, for which Watkins Payne supplied building services engineering, vertical transportation engineering, BREEAM duties and energy consultancy to achieve an BREEAM ‘Excellent’ and EPC B rating.
New build residential development providing 142 units over 3 blocks up to 16 storeys in height.
The completed site now comprises four detached industrial warehouse units ranging from 14,000sq ft to 36,000sq ft, all with naturally ventilated and heated offices. The two larger units each have an 8 person MRL passenger lift, while the smaller units have been provided with platform lifts. The warehouse area was designed as a shell for future fit-out with capped off utility services.
103 Colmore Row in Birmingham, has achieved a successful practical completion with BREEAM accreditation of ‘Excellent’, an EPC Rating A, and WiredScore rating of ‘Platinum’.