
Bumpstead Road Suffolk
The building is provided with natural ventilation and LTHW heating to the showroom and office areas, plus the toilets which also receive hot water from the same boiler installation.




61 Whitehall is the long term home since 1895 of the Royal United Services Institute (RUSI) that needed a complete refurbishment and upgrade to suit its current day needs and operational requirements. The works to the Grade II* listed building included the addition of a new floor, fully refreshed library and function rooms, plus creation of a south facing dome that will be used for multiple different events using electrochromic glazing.
The MEP services were all replaced with a focus on energy efficiency using air source heat pumps, LED lighting and natural ventilation where possible. The services were designed to suit the bespoke fit out requirements of RUSI all integrated into the architectural features within the listed building.

The building is provided with natural ventilation and LTHW heating to the showroom and office areas, plus the toilets which also receive hot water from the same boiler installation.

Quay Place in Birmingham is situated next to the Utilita Arena which is a sport, exhibition and a concert venue. The works consisted of a new structure to contain the main reception, meeting room, changing facilities and a café for the site.

Watkins Payne were commissioned to undertake the design and refurbishment of the 2 retail units, 15 residential units and office space.

Located to the east of Carnaby Street and part of the Shaftesbury portfolio, 57 Broadwick Street has undergone an extensive refurbishment of the office and retail podium area to provide new shell restaurant and retail units, two new apartments on the fourth floor, and 20,445sq.ft office accommodation on first, second, third and part fourth floors.

The development at Thirty High will comprise circa 300,000ft² of primary office led accommodation together with retail and amenity space.

The project also involved the refurbishment of the reception space and improvement of the cycle store entrance and wayfinding at basement level.