90 Long Acre

Client

Internal Floor Area

The 90 Long Acre redevelopment scheme consists of a major refurbishment and extension of the existing 1980s building. The development is an 8 storey building comprising 20,988m² (NIA) of office area and 1,903m² of retail (A1,D1,D2 and SG) area located on lower ground – and upper ground floors.

The office HVAC consisting of a mixed-mode design with openable façade elements allowing for natural ventilation and cooling when available to the perimeter zones. Hot water for space heating is provided by air source heat pumps and chilled water for cooling is generated via air cooled chillers. Multi function heat recovery air source heat pumps are utilised during simultaneous heating and cooling conditions for high efficiency operation. 

Watkins Payne Services Provided:

More CASE STUDIES
Refurbishment

Fortess Grove

The exposed services strategy implemented at Fortess Grove compliments the industrial nature of the building. Cycling facilities are provided along with showers and lockers at ground floor level accessed directly from the rear of the building along Railey Mews. The development achieved a WiredScore certification of ‘Gold’ and a B rated Energy Performance Certification.

Read More »
Residential

Albany House & 80-82 Mortimer Street

Client

Gross Internal Floor Area
The Crown Estate’s redevelopment of Albany House and 80-82 Mortimer Street has been an extensive and vital project to the area’s revitalization. Among the project’s numerous tasks,

Read More »
Sustainability

57 Broadwick Street, London

Located to the east of Carnaby Street and part of the Shaftesbury portfolio, 57 Broadwick Street has undergone an extensive refurbishment of the office and retail podium area to provide new shell restaurant and retail units, two new apartments on the fourth floor, and 20,445sq.ft office accommodation on first, second, third and part fourth floors.

Read More »
Offices

1 Blyth Gate, Birmingham

1 Blyth Gate, Birmingham is a three-story office development in Solihull. It boasts a triple height reception and the amenity spaces within the business park in which the development sits offer excellent views of the surrounding area. The building has been provided with additional showers and cycling facilities to assist in promoting sustainable travel methods to work and drive down carbon emissions.

Read More »
Retail

234 Bath Road, Slough

234 Bath Road development located in Slough is arranged over ground, first and second floors, with a basement level car park and podium level car park to the rear. The development constructed in 2016 stand at 68,000 ft2 of office accommodation. Part of the ground office floor area was utilised to provide a café to enhance the amenities within the development.

Read More »
Sustainability

1000 Hillswood Park

1000 Hillswood Park is targeting BREEAM ‘Excellent’, EPC target of ‘A’ and a NABERS UK Design Reviewed Target Rating of 5.0 Stars.

Read More »