
Multistory
Multistory (formerly 2 Colmore Square and Cannon House) is setting the new benchwork for Sustainability, targeting WiredScore Platinum, Fitwel 2 star and Energy Performance Certificate (EPC) of ‘B’.

Watkins Payne carried out the Independent Design Reviewer role for Red Lion Court, a mixed use commercial office development, located in central London.
A single stage formal review was conducted for the project which is targeting a 5.0 Star Rating.

Multistory (formerly 2 Colmore Square and Cannon House) is setting the new benchwork for Sustainability, targeting WiredScore Platinum, Fitwel 2 star and Energy Performance Certificate (EPC) of ‘B’.

St Martin’s Courtyard is a beautiful open-air shopping and dining destination located in the heart of Covent Garden.

The 7,600ft² area of 7 Bermondsey Street near London Bridge Station was refurbished to high quality office accommodation, for which Watkins Payne supplied building services engineering and vertical transportation engineering. The refurbished area is spread across basement and ground floor.

Located in the heart of London’s West End, 9 Cavendish Square is undergoing a high-quality refurbishment to transform this prestigious address into a modern, efficient, and sustainable workplace. The works involve a full mechanical, electrical, and public health (MEPH) services upgrade to deliver a building that meets contemporary operational and environmental standards.

The building at 20 St James’ Street has been refurbished to offer 53,295ft² of high quality office accommodation, for which Watkins Payne supplied building services engineering, vertical transportation engineering, BREEAM duties and energy consultancy to achieve an BREEAM ‘Very Good’ and EPC B rating.

The completed site now comprises four detached industrial warehouse units ranging from 14,000sq ft to 36,000sq ft, all with naturally ventilated and heated offices. The two larger units each have an 8 person MRL passenger lift, while the smaller units have been provided with platform lifts. The warehouse area was designed as a shell for future fit-out with capped off utility services.