The Claridge’s Hotel

Client

The Practice was responsible for designing the complete refurbishment of the mechanical, electrical and public health services to all of the guest rooms, together with the penthouse units. The project also included the provision of services to new conference rooms and a fully integrated health suite. As an integral part of the refurbishment the major central plant items comprising transformers, switchgear, chilled water plant, heating plant, cold water storage and hot water generating plant were replaced. The technical challenges were extenisve as the hotel remained in operation throughout the works.

Watkins Payne Services Provided:

More CASE STUDIES
Offices

1 Blyth Gate, Birmingham

1 Blyth Gate, Birmingham is a three-story office development in Solihull. It boasts a triple height reception and the amenity spaces within the business park in which the development sits offer excellent views of the surrounding area. The building has been provided with additional showers and cycling facilities to assist in promoting sustainable travel methods to work and drive down carbon emissions.

Read More »
Vienna House
Sustainability

Vienna House

Vienna House is an impressive three storey refurbishment that provides 26,000ft² of office space across the development which provides best in class cycle commuter facilities.

Read More »
Eastbourne Terrace
Sustainability

50 Eastbourne Terrace

New build mixed-use development comprising a commercial building housing both office and retail accommodation along with a row of 7 four level mews houses.

Read More »
St James's Place
Offices

St James’s Place

The building services use a 4-pipe fan coil unit arrangement with various ventilation systems to suit the different use areas. Full building power back-up standby generation, UPS, security and access control and automatic blinds all formed part of the fit-out.

Read More »
Sustainability

101 New Cavendish Street

A wealth of experience in exposed services projects has enabled Watkins Payne to provide the highest level specification for the refurbishment of over 50,000ft² of office space at 101 New Cavendish Street in London.

Read More »
Offices

61 Whitehall

The MEP services were all replaced with a focus on energy efficiency using air source heat pumps, LED lighting and natural ventilation where possible.

Read More »