Project Shelby, 2 Colmore Row
The successful refurbishment and fit-out of the lower ground and ground floors.

The project delivers a 7 storey 119,000ft² commercial office building (pre-let before completion), 6 retail units (with combination of A1, A3 and A4 uses) and 54 prime residential apartments located in a 194,000ft² 18 storey tower with panoramic views over Hyde Park. The buildings are complimented with new public realm landscaped spaces.
All elements are constructed over a 5 level basement that includes car park, residential amenities such as swimming pool, gym, sauna, cinema, business suite and child’s play area, along with cycling stores and changing facilities.
The mixed use scheme is served from communal heating and cooling plant in order to make best use of efficient distribution to suit the 24 x 7 operational needs.
The office building has achieved a BREEAM ‘Excellent’ rating with ‘Very Good’ ratings for the retail units.
The successful refurbishment and fit-out of the lower ground and ground floors.
Client
Gross Internal Floor Area
Acting on behalf of Oxford Properties the practice has undertaken both decarbonisation and Cat A refurbishment within the circa 350,000ft2 office led building while maintaining full operation for existing tenants throughout.
All MEP systems within One Hanover Street are being fully replaced, with new services distributed through the upgraded risers to each office floor. The refurbished building will benefit from high-efficiency heat-recovery systems, LED lighting throughout, intelligent lighting controls, a common network system and new fan-coil units among other modern building services upgrades.
This prestigious development is focused on delivering best-in-class workplace standards while achieving high levels of sustainability, occupant wellbeing and energy efficiency.
Located in the heart of London’s West End, 9 Cavendish Square is undergoing a high-quality refurbishment to transform this prestigious address into a modern, efficient, and sustainable workplace. The works involve a full mechanical, electrical, and public health (MEPH) services upgrade to deliver a building that meets contemporary operational and environmental standards.
Sustainability is incredibly important for the Client and as such the building is BREEAM ‘Outstanding’, WELL ‘enabled’ Gold, alongside WiredScore Platinum. In addition, the Design for Performance approach is been adopted in order to minimise operational energy and hence carbon emissions.