The Claridge’s Hotel

Client

The Practice was responsible for designing the complete refurbishment of the mechanical, electrical and public health services to all of the guest rooms, together with the penthouse units. The project also included the provision of services to new conference rooms and a fully integrated health suite. As an integral part of the refurbishment the major central plant items comprising transformers, switchgear, chilled water plant, heating plant, cold water storage and hot water generating plant were replaced. The technical challenges were extenisve as the hotel remained in operation throughout the works.

Watkins Payne Services Provided:

More CASE STUDIES
Sustainability

21 St James’ Square, London

The Grade II listed 21 St James’ Square building has been refurbished to offer 89,000ft² of high quality office accommodation, for which Watkins Payne supplied building services engineering, vertical transportation engineering, energy consultancy to achieve an BREEAM ‘Very Good’ and EPC B rating.

Read More »
Eastbourne Terrace
Sustainability

50 Eastbourne Terrace

New build mixed-use development comprising a commercial building housing both office and retail accommodation along with a row of 7 four level mews houses.

Read More »
Sustainability

101 New Cavendish Street

A wealth of experience in exposed services projects has enabled Watkins Payne to provide the highest level specification for the refurbishment of over 50,000ft² of office space at 101 New Cavendish Street in London.

Read More »
1 New Burlington Place, Mayfair
Sustainability

1 New Burlington Place, Mayfair

The building at 1 New Burlington Place has been redeveloped to offer 183,000ft² of high quality office and retail accommodation, for which Watkins Payne supplied building services engineering, vertical transportation engineering and energy consultancy to achieve an EPC A rating. We also supplied BREEAM services and achieved a BREEAM Excellent rating for the development.

Read More »
Offices

61 Whitehall

The MEP services were all replaced with a focus on energy efficiency using air source heat pumps, LED lighting and natural ventilation where possible.

Read More »