Unit 8 Chichester Business Park

Gross Internal Floor Area

Unit 8, in Tangmere Business Park near Chichester has been provided with a complete refurbishment giving both the warehouse and associated office space attached a much needed re-fresh and new feel.

The office space consists of circa 20,000 ft2 and has been provided with new VRF heating and cooling plant coupled with natural ventilation and some supplementary ventilation to internal meeting rooms. It also benefits from a new fire alarm and LED lighting giving it an as new feel.

The warehouse space, which is vast, provides the majority of the NIA and was stripped back to a shell with only a small amount of the existing services retained which were left by the previous tenant.

In addition to the new plant, an existing photovoltaic array was cleaned, rebuffed and reinstalled on the roof to further improve the buildings sustainability credentials.

With the installation of the new plant, high efficiency LED lighting and the photovoltaic panels the scheme comfortably achieved the clients targeted ‘B’ rated EPC.

The space has already been let with the new tenant having input into the design and fit out of the space to minimise wastage when they move in.

Watkins Payne Services Provided:

More CASE STUDIES
Sustainability

10 Brock Street, Regents Place

The mixed use development comprises two office buildings totalling 530,000ft² of high quality office accommodation together with a 162 unit residential scheme consisting of a 26 storey private apartment tower and affordable housing building. The scheme also includes retail units and a community arts facility. 10 Brock Street is the larger of the office buildings and Watkins Payne supplied building services engineering, vertical transportation engineering, BREEAM duties and energy consultancy to achieve BREEAM ‘Excellent’ and an EPC B rating.

Read More »
Sustainability

Academy House, London

Academy House was refurbished to provide 22,100ft² of high quality office accommodation. Watkins Payne supplied building services engineering which saw the 3rd to 6th floor including the ground floor reception of Academy House converted into open plan office areas and reception. This became the London headquarters for Sports Direct.

Read More »
Sustainability

One Hanover Street

All MEP systems within One Hanover Street are being fully replaced, with new services distributed through the upgraded risers to each office floor. The refurbished building will benefit from high-efficiency heat-recovery systems, LED lighting throughout, intelligent lighting controls, a common network system and new fan-coil units among other modern building services upgrades.

Read More »
Refurbishment

Apex Tower

Apex Tower located next to New Malden train station is a 15-story office development. At ground level an enlarged prestigious reception area is provided which leads to commuter facility with unisex showers and drying room. The refurbishment works is targeting BREEAM RFO ‘Very Good’ and achieved an Energy Performance Certification rating of ‘B’.

Read More »
Sustainability

57 Broadwick Street, London

Located to the east of Carnaby Street and part of the Shaftesbury portfolio, 57 Broadwick Street has undergone an extensive refurbishment of the office and retail podium area to provide new shell restaurant and retail units, two new apartments on the fourth floor, and 20,445sq.ft office accommodation on first, second, third and part fourth floors.

Read More »