Hilton Garden Inn, Abingdon
Hilton Garden Inn Hotel in Abingdon has undergone a major refurbishment.
The two unit 161,000ft² Skyline development for SEGRO plc provides well connected Grade A logistics, distribution and warehousing facilities as it is adjacent to Heathrow Airport and the immediate motorway and rail networks.
Constructed on a design and build basis with the office accommodation fitted out to Category A standard, the project benefits from sustainability initiatives including LED lighting with occupancy detection and daylight dimming controls, solar thermal hot water heating, air source heat pumps and photovoltaic panels, all combining to provide an A rated EPC and a ‘Very Good’ rating under BREEAM New Construction 2014.
Hilton Garden Inn Hotel in Abingdon has undergone a major refurbishment.
Watkins Payne was commissioned to design a Cat A fit-out refurbishment across the existing 11,800sq.ft building. The ground floor was completely redeveloped with a new office entrance lobby and 1,300sq.ft new retail space.
St James’s Market Phase 2 is the “pioneer” related to the Design for Performance initiative and NABERS UK rating.
Watkins Payne reviewed a number of mechanical and electrical options with the team, focusing on retention of key central plant, overhaul and replacement of plant where required, and LED lighting to reduce energy and improve the office environment.
The building has been transformed to provide a 133 bedroom hotel including car and cycle parking on site.
Watkins Payne was involved with the Fetter Yard project on 86 Fetter Lane for 5 years and provided the MEP services design and BREEAM assessment.