Search
Close this search box.
Vantage Point

Client

Gross Internal Floor Area

Vantage London, formerly occupied by Wimpey Construction, is a 12 storey landmark building overlooking the A4 flyover leading from the M4 into West London.

Last refurbished in the late 1980s, the offices were in need of modernisation to deliver energy savings. Watkins Payne were commissioned to develop several designs with the design team to upgrade in an economic manner that would provide interest and enhance the letting strategies.

Watkins Payne reviewed a number of mechanical and electrical options with the team, focusing on retention of key central plant, overhaul and replacement of plant where required, and LED lighting to reduce energy and improve the office environment.

The main entrance was completely refurbished with a new double height reception, and the ground floor was given greater visibility and user interest by adopting an exposed services solution separate from the upper floor office services strategy.

A gym, washrooms and shell restaurant were provided to serve the 115,000ft² of office accommodation.
The refurbishment was executed with partial tenant occupation, so communication and careful design and commissioning strategies were major considerations throughout the project.

Watkins Payne Services Provided:

More CASE STUDIES

101 New Cavendish Street

A wealth of experience in exposed services projects has enabled Watkins Payne to provide the highest level specification for the refurbishment of over 50,000ft² of office space at 101 New Cavendish Street in London.

Read More »
36 Carnaby Street external photo of the building

36 Carnaby Street

The speculative office space is fitted out to a Category A standard and will be British Council of Offices (BCO) Guide to Specification 2019 compliant. The refurbishment has adjusted the temperature control zones to pull them better in line with the BCO recommendations than currently provided.

Read More »
Get in touch with our team