Search
Close this search box.
Minerva House

Client

Internal Floor Area

The Minerva House redevelopment works will include the partial demolition of the existing building and extension comprising of additional upper floors and a new lower ground floor. The development is a 9 storey building comprising 12,659 m² (NIA) of office area over basement to eighth floor and 289 m² of retail area located at ground floor. 

The office HVAC consists of variable refrigerant flow fan coil units and on floor fresh air ventilation systems. Domestic hot water for office toilets and showers are served by central storage served by dedicated air source heat pumps. 

  • Project Manager
    Opera PM
  • Ben Adams Architects

Watkins Payne Services Provided:

More CASE STUDIES
Sustainability

32 Duke Street, London

32 Duke Street in the heart of St James’s, the contemporary development known as The Marq comprises mixed use accommodation, with A1 and A3 retail units across ground and basement floors and 35,460ft2 of office space on six upper levels.

Read More »
1 Forbury
Refurbishment

1 Forbury Place Reading

Watkins Payne provided MEP systems and IT cabling design services for the fit-out of 186,000ft2 of commercial offices in the eight storey 1 Forbury Place in Reading, which formed the focus of SSE Services plc’s relocation strategy to consolidate several buildings from across southern England and accommodate 1,500 employees in a single location.

Read More »
86 Fetter Lane
Sustainability

Fetter Yard, London

Watkins Payne was involved with the Fetter Yard project on 86 Fetter Lane for 5 years and provided the MEP services design and BREEAM assessment.

Read More »
Sustainability

The Northcliffe

The project involved the refurbishment and extension of the existing building to deliver over 260,000sq ft of office space, achieving BREEAM ‘Outstanding’.

Read More »
Get in touch with our team