The Northcliffe

Client

Gross Internal Floor Area

Northcliffe House, the original Daily Mail building south of Fleet Street has been extended and refurbished. The project received planning consent in January 2021 and we have taken the design through to RIBA Stage 4. The practice has been working on the project from the initial feasibility studies through to the present.

The project involved the refurbishment and extension of the existing building to deliver over 260,000sq ft of office space over lower ground to sixth floor levels, together with a new ground floor entrance, new landscaped terraces and retail provision, along with new basement end of journey facilities.

Sustainability was high on the Client’s agenda throughout with the project targeting BREEAM ‘Excellent’ from the outset. As the project developed the aspiration for the achievement of BREEAM ‘Outstanding’ was ambitiously pursued and in August 2023 the project was successfully awarded this ‘Outstanding’ rating. The sustainability principles were adopted where the constraints of the existing building allowed together with maximising biodiversity and renewable energy solutions.

As part of the refurbishment, in line with the current London Plan requirements, the combustion of natural gas has been omitted from the building. Heating and domestic hot water is now provided by air source heat pumps.

The low and zero carbon technologies included in the scheme are air source heat pumps to provide the heating and cooling, water source heat pumps to elevate the domestic hot water services temperature and an array of PV above the roof external plant enclosures. The incorporation of these LZCs in conjunction with energy efficiency measures such as LED lighting throughout with occupancy and daylight dimming controls has contributed to an overall Building Regulations Part L2 carbon emission saving of 64.1 %.

‘The Northcliffe won the award for best Refurbishment and Fit Out (RFO) at the BREEAM 2024 Awards in July 2024.’

Watkins Payne Services Provided:

More CASE STUDIES
Sustainability

76 Southbank

Sustainability is incredibly important for the Client and as such the building is BREEAM ‘Outstanding’, WELL ‘enabled’ Gold, alongside WiredScore Platinum. In addition, the Design for Performance approach is been adopted in order to minimise operational energy and hence carbon emissions.

Read More »
IDR - Independent Design Review

90 Long Acre

The project also involved the refurbishment of the reception space and improvement of the cycle store entrance and wayfinding at basement level.

Read More »
Refurbishment

6-10 Market Road

6-10 Market Road is an office building which was originally constructed in 1989. Watkins Payne were commissioned to design a Cat B fit out refurbishment of the area for a single tenant.

Read More »
Sustainability

63-81 Pelham Street

‘The Royal Borough of Kensington and Chelsea has granted planning consent for 115,000 sq ft of new high-quality office space at 63-81 Pelham Street.’

Read More »
Refurbishment

Saffron House

Saffron House was refurbished to provide 38,000ft² of high quality office accommodation. Watkins Payne supplied building services engineering which saw the 1st, 2nd and the 3rd floor including the ground floor reception of Saffron House converted into open plan office areas and reception.

Read More »
1 New Burlington Place, Mayfair
Sustainability

1 New Burlington Place, Mayfair

The building at 1 New Burlington Place has been redeveloped to offer 183,000ft² of high quality office and retail accommodation, for which Watkins Payne supplied building services engineering, vertical transportation engineering and energy consultancy to achieve an EPC A rating. We also supplied BREEAM services and achieved a BREEAM Excellent rating for the development.

Read More »