Arca, Birmingham

Client

Gross Internal Floor Area

In the heart of the Birmingham city centre overlooking the cathedral this 65,000ft² refurbished office space is positioned in a prominent location. The development includes a basement, lower ground, upper ground, 1st floor to 9th floor with a combination of retail, amenity and office Cat A and Cat B offerings.

The entrance to the building is off Temple Row into a double height reception which is luminated with the use of curve lighting wrapping around the columns highlighting the rich colour palate of textures on the finishes and furnishing.

Exposed services has been adopted for the office floor provided with new LED linear lighting, ducted fan coil units and power distributed within the office floor void. Air source heat pump (ASHP) provide the heating and cooling to the space utilizing low carbon technology. Upper floors (3rd to 8th floor) are served from a central air handling unit (AHU) with heat recovery. The AHU provide demand ventilation with the use of the on-floor CO2 sensors controlled via the building management system.

The basement level provides end of trip facilities with male and female showers and changing facilities, along with secure cycle storage.

The refurbishment work is targeting BREEAM “Excellent” certification, and the office floors has achieved an “A” rated Energy Performance Certificate (EPC).

  • Project Manager
    Norman Rourke Pryme
  • Brownhill Hayward Brown Ltd
  • Cost Consultant
    Norman Rourke Pryme

Watkins Payne Services Provided:

More CASE STUDIES
Residential

2 New Burlington Street, Mayfair, London

The Grade II listed building at 2 New Burlington Street has been redeveloped to offer 5,000ft² of high quality residential accommodation, for which Watkins Payne supplied building services engineering and energy consultancy to achieve an EPC D rating.

Read More »
Sustainability

One Hanover Street

All MEP systems within One Hanover Street are being fully replaced, with new services distributed through the upgraded risers to each office floor. The refurbished building will benefit from high-efficiency heat-recovery systems, LED lighting throughout, intelligent lighting controls, a common network system and new fan-coil units among other modern building services upgrades.

Read More »
Eastbourne Terrace
Sustainability

50 Eastbourne Terrace

New build mixed-use development comprising a commercial building housing both office and retail accommodation along with a row of 7 four level mews houses.

Read More »
Refurbishment

1 Forbury Place Reading

Watkins Payne provided MEP systems and IT cabling design services for the fit-out of 186,000ft2 of commercial offices in the eight storey 1 Forbury Place in Reading, which formed the focus of SSE Services plc’s relocation strategy to consolidate several buildings from across southern England and accommodate 1,500 employees in a single location.

Read More »
Sustainability

Pegasus Mayfair

The development Pegasus Mayfair is targeting a B rated EPC, BREEAM ‘Outstanding’ and WELL ‘Gold’ and Watkins Payne is providing these services.

Read More »
Sustainability

Navigation Park Phase 2, Enfield

The carbon neutral status was achieved by exemplary as-built air tightness facade solar and thermal performance significantly in excess of the Building Regulations requirements, highly energy efficient M&E systems, LED lighting and photovoltaic panel arrays on the roof of the warehouse.

Read More »